Soquel Congestion

Delayed due to setbacks in commercial development permit timeline
By June 2021 By December 2021, Public Works will reduce congestion at key intersections on Soquel Drive from 41st Avenue to Main Street.

Key Steps

1 2 3 4
Determine existing Level of Service (LOS). Install signal at Soquel Drive and Robertson Street. Synchronize signals at 41st Avenue, Robertson Street, Porter Street and Main Street. Measure LOS after synchronization.
Plan Reference: Collaborating Depts:
Target:
Progress:
3.A.i PLN B - AM/C - PM Level of Service 5% (5%)

Level of Service (LOS) is a qualitative measure of traffic performance based on measures like vehicle speed, density, and congestion.
Existing LOS at the intersections addressed in this objective are:
Soquel Drive / 41st Avenue – C (am) / D (pm).  
Soquel Drive / Robertson St. – E (am) / F (pm).   
Soquel Drive / Daubenbiss Ave. – B (am) / A (pm).
Soquel Drive / Porter St. – E (am) / E (pm).

Future mitigations will result in a projected LOS of:
Soquel Drive / 41st Avenue – C (am) / C (pm).
Soquel Drive / Robertson St. – B (am) / D (pm).   
Soquel Drive / Daubenbiss Ave. – B (am) / A (pm).
Soquel Drive / Porter St. – C (am) / D (pm).